Projects

Client

Tacoma Hydraulics

Date

July to October 2020 (4-month turnaround)

About Project

The scope of work consisted of corrosion protection of all hydraulic cylinders, deck winches, large winch drum, boom, and associated parts. Coast Guard crew was at our shop daily checking blast profiles, coating thickness, and overall inspection of the parts we worked on.

Client

Precision Iron Works – Amazon Project Beige

Date

March to July 2021 (5-month turnaround)

About Project

Sandblasted and painted over 1500 pieces of perimeter, stair and guard rails in Safety Yellow. We also worked on stair stringers, mezzanines and support columns.

Issaquah Costco Headquarters

Client

B & B Fabricators

Date

August to December 2021 (5-month turnaround)

About Project

The scope of the work consisted of sandblasting and priming HSS Frames, canopies, and mechanical equipment screens that were installed at the Costco Headquarters.

Hinoki Housing Project

Client

Alliance Steel Fabricators

Date

December 2020 to March 2022

About Project

Bench frames, screen frames, rail posts, fence posts, structural steel, perforated panels, and stairs – three-coat high-performance coating.

Washington State Convention Center

Client

A & B Fabricators

Date

October 2020 to April 2022

About Project

Bench frames, screen frames, rail posts, fence posts, structural steel, perforated panels, and stairs – three-coat high-performance coating.

Ketchikan Gravina & Revilla Ferry Terminal

Client

Skyline Steel

Date

October 2020 (1-month turnaround)

About Project

Sheet Pile – sandblast and paint with a high-performance marine paint system.

Anacortes Marina

Client

Skyline Steel

Date

November 2020 to June 2021 (8-month turnaround)

About Project

Sandblast and paint with a three-coat system, the third coat being in the wave zone.

Facebook Building X

Client

McKinstry Company

Date

November 2021 to April 2022 (6-month turnaround)

About Project

Sandblast and paint high-performance three-coat system to tables, frames, and platforms.

Crane Refurbish

Client

WHECO Corp.

Date

July to August 2021 (2-month turnaround)

About Project

We removed all existing failing coatings via sandblasting. Once parts were sandblasted, WHECO fixed damaged welds. Once received back we sandblasted, followed by a three-coat high-performance coating system.

Metro Bus Shelter

Client

Standard Steel Fabricating Company

Date

December 2021 to January 2022 (2-month turnaround)

About Project

This was a new construction bus shelter roughly 5,200 sqft. We sandblasted and applied a three-coat coatings system – zinc primer, epoxy mid-coat, polyurethane top-coat.

Google Pedestrian Bridge

Client

AAA Welding

Date

November 2021 (1-month turnaround)

About Project

Three-section pedestrian bridge – we sandblasted and primed with a zinc primer, then the bridge was top-coated in the field after installation by others.

Sound Transit Light Rail Stanchions

Client

MBI Construction Services

Date

February to April 2022 (3-month turnaround)

About Project

Pipe stanchions for light rail track and walkway – sandblasted and coated per the Sound Transit high-performance coating system #2.